Environmental
- Chapter 01 – Introduction
- Chapter 02 – Background to the Proposed Development
- Chapter 03 – Consideration of Reasonable Alternatives
- Chapter 04 – Description of the Proposed Development
- Chapter 05 – Population and Human Health
- Chapter 06 – Biodiversity
- Chapter 07 – Ornithology
- Chapter 08 – Land, Soils and Geology
- Chapter 09 – Hydrology, Hydrogeology and Water Quality
- Chapter 10 – Air Quality and Climate
- Chapter 11 – Noise and Vibration
- Chapter 12 – Shadow Flicker
- Chapter 13 – Landscape and Visual Impact
- Chapter 14 – Archaeological, Architectural and Cultural Heritage
- Chapter 15 – Material Assets
- Chapter 16 – Interaction of Effects
- Chapter 17 – Schedule of Mitigation and Monitoring Measures
- Appendix 01.01 – Curricula Vitae
- Appendix 01.02 – Developments Considered for Cumulative Assessment
- Appendix 01.03 – Glossary of Terms and Abbreviations
- Appendix 02.01 – Rehabilitation Plans & Reports – Part 1 of 3
- Appendix 02.01 – Rehabilitation Plans & Reports – Part 2 of 3
- Appendix 02.01 – Rehabilitation Plans & Reports – Part 3 of 3
- Appendix 02.02 – Copy of Scoping Letters, Reports and Responses – Part 1 of 5
- Appendix 02.02 – Copy of Scoping Letters, Reports and Responses – Part 2 of 5
- Appendix 02.02 – Copy of Scoping Letters, Reports and Responses – Part 3 of 5
- Appendix 02.02 – Copy of Scoping Letters, Reports and Responses – Part 4 of 5
- Appendix 02.02 – Copy of Scoping Letters, Reports and Responses – Part 5 of 5
- Appendix 02.03 – Community Engagement Report – Part 1 of 2
- Appendix 02.03 – Community Engagement Report – Part 2 of 2
- Appendix 02.04 – SID Determination and Meeting Minutes
- Appendix 02.05 – NPWS Consultation
- Appendix 04.01 – Construction Environmental Management Plan (CEMP)
- Appendix 04.02 – Abnormal Indivisible Load Route Survey Report – Part 1 of 2
- Appendix 04.02 – Abnormal Indivisible Load Route Survey Report – Part 2 of 2.pdf
- Appendix 04.03 – Grid Connection Drawings – Part 01 of 11
- Appendix 04.03 – Grid Connection Drawings – Part 02 of 11
- Appendix 04.03 – Grid Connection Drawings – Part 03 of 11
- Appendix 04.03 – Grid Connection Drawings – Part 04 of 11
- Appendix 04.03 – Grid Connection Drawings – Part 05 of 11
- Appendix 04.03 – Grid Connection Drawings – Part 06 of 11
- Appendix 04.03 – Grid Connection Drawings – Part 07 of 11
- Appendix 04.03 – Grid Connection Drawings – Part 08 of 11
- Appendix 04.03 – Grid Connection Drawings – Part 09 of 11
- Appendix 04.03 – Grid Connection Drawings – Part 10 of 11
- Appendix 04.03 – Grid Connection Drawings – Part 11 of 11
- Appendix 06.01 – Biodiversity Enhancement & Management Plan
- Appendix 06.02 – Aquatic Ecology Baseline Reports – Part 1 of 4
- Appendix 06.02 – Aquatic Ecology Baseline Reports – Part 2 of 4
- Appendix 06.02 – Aquatic Ecology Baseline Reports – Part 3 of 4
- Appendix 06.02 – Aquatic Ecology Baseline Reports – Part 4 of 4
- Appendix 06.03 – Littleton Wind Farm Bat Report
- Appendix 06.04 – Invasive Species Management Plan
- Appendix 07.01 – Baseline Ornithology Report – Part 1 of 9
- Appendix 07.01 – Baseline Ornithology Report – Part 2 of 9
- Appendix 07.01 – Baseline Ornithology Report – Part 3 of 9
- Appendix 07.01 – Baseline Ornithology Report – Part 4 of 9
- Appendix 07.01 – Baseline Ornithology Report – Part 5 of 9
- Appendix 07.01 – Baseline Ornithology Report – Part 6 of 9
- Appendix 07.01 – Baseline Ornithology Report – Part 7 of 9
- Appendix 07.01 – Baseline Ornithology Report – Part 8 of 9
- Appendix 07.01 – Baseline Ornithology Report – Part 9 of 9
- Appendix 07.02 – Collision Risk Model Report
- Appendix 08.01 – Geotechnical and Peat Stability Assessment Part 1 of 3
- Appendix 08.01 – Geotechnical and Peat Stability Assessment Part 2 of 3
- Appendix 08.01 – Geotechnical and Peat Stability Assessment Part 3 of 3
- Appendix 08.02 – Peat and Spoil Management Plan
- Appendix 09.01 – Site Specific Flood Risk Assessment
- Appendix 09.02 – Water Framework Directive Compliance Assessment Report
- Appendix 09.03 – Surface Water Management Plan
- Appendix 09.04 – Schedule of Watercourse Crossings
- Appendix 10.01 – Air and Climate Calculations
- Appendix 11.01 – Baseline Noise Measurements
- Appendix 11.02 – Equipment Calibration Certificates
- Appendix 11.03 – Noise Sensitive Location Details
- Appendix 11.04 – Wind Turbine Sound Power Level Data
- Appendix 11.05 – Predicted Noise from Wind Farm at Nearby Noise Sensitive Locations
- Appendix 11.06 – Predicted Cumulative Noise Levels at Nearby Noise Sensitive Locations
- Appendix 12.01 – Total Theoretical Shadow Times Per Receptor
- Appendix 12.02 – Total Theoretical Shadow Times per Turbine
- Appendix 13.01 – Assessment of Visual Impacts at Viewshed Reference Points
- Appendix 13.02a – VP Location Maps
- Appendix 13.02b – RSA Screening Classification
- Appendix 13.02c – ZTV Potential Views of Turbines
- Appendix 13.02d – ZTV Cumulative Existing
- Appendix 13.02e – Cumulative Potential Future
- Appendix 14.01 – Archaeological Inventory Descriptions and Database of Irish Excavation Report Entries
- Appendix 14.02 – National Museum of Ireland Topographical File Entries
- Appendix 14.03 – Cultural Heritage Photographic Record
- Appendix 15.01 – Telecommunications Impact Study
- Appendix 15.02 – Civil Aviation Review Statement
- Appendix 15.03 – Department of Defence – AirCorps Aviation Review Statement
- Appendix 15.04 – Aviation Consultations
- Figure 03.01 – DI1 Turbine Layout
- Figure 03.02 – DI2 Turbine Layout
- Figure 03.03 – DI3 Turbine Layout
- Figure 03.04 – DI4 Turbine Layout
- Figure 03.05 – Turbines All Iterations
- Figure 03.06 – Alternative Grid Connections
- Figure 03.07 – Alternative Substation Locations
- Figure 04.01 – Site Location
- Figure 04.02a – Site Layout a
- Figure 04.02b – Site Layout b
- Figure 04.02c – Site Layout c
- Figure 04.03a – Grid Connection Route a
- Figure 04.03b – Grid Connection Route b
- Figure 04.03c – Grid Connection Route c
- Figure 04.04 – Turbine Delivery Route
- Figure 04.05 – Properties within 2km of Turbine
- Figure 04.06 – Wind Farms within 20km of Site
- Figure 04.07 – Amenity Tracks
- Figure 05.01a – Population Human Health Study Area a
- Figure 05.01b – Population Human Health Study Area b
- Figure 05.02 – Receptors within 1km vicinity of the Wind Farm Site
- Figure 06.01 – European Sites within Zone of Influence
- Figure 06.02 – National Sites within Zone of Influence
- Figure 06.03 – Static Detector Locations 2023
- Figure 06.04 – Static Detectors Locations 2025
- Figure 06.05 – Transect Routes and Turbine Locations
- Figure 06.06 – Grid Connection Survey Locations
- Figure 06.07a – Habitat Map a
- Figure 06.07b – Habitat Map b
- Figure 06.07c – Habitat Map c
- Figure 06.08 – Areas to be DRB Capable of Regeneration, Indicated by BnM Hydrological Modelling
- Figure 06.09 – Mammal Field Signs
- Figure 06.10 – Round 1 Transect Routes and Distribution of Bats
- Figure 06.11 – Round 2 Transect Routes and Distribution of Bats
- Figure 06.12 – Round 3 Transect Routes and Distribution of Bats
- Figure 06.13a – Marsh Fritillary
- Figure 06.13b – Marsh Fritillary
- Figure 06.13c – Marsh Fritillary
- Figure 06.14a – Bat Habitat Loss Gap Assessment
- Figure 06.14b – Bat Habitat Loss Gap Assessment
- Figure 06.14c – Bat Habitat Loss Gap Assessment
- Figure 06.15 – BEMP Measures
- Figure 06.16 – Invasive Species at Proposed Wind Farm
- Figure 07.01 – Map of Key Habitat Areas
- Figure 07.02 – Key Habitat Area 1 Longfordpass South Lakes
- Figure 07.03 – Key Habitat Area 2 Bawnreagh Lakes
- Figure 07.04 – Key Habitat Area 3 Derryhogan Lakes
- Figure 07.05 – Key Habitat Area 4 Lanespark Bog
- Figure 07.06 – Key Habitat Area 5 Clonoura Bog
- Figure 07.07a – Ornithological Screening Barriers
- Figure 07.07b – Ornithological Screening Barriers
- Figure 07.07c – Ornithological Screening Barriers
- Figure 08.01 – Ecological Designation Area
- Figure 08.02 – Quaternary Geology
- Figure 08.03 – Bedrock Geology
- Figure 08.04 – Karst Distribution
- Figure 08.05 – Geological Heritage
- Figure 08.06 – Economic Geology
- Figure 08.07 – Crushed Rock Aggregate Potential
- Figure 08.08 – Landslide Susceptibility
- Figure 08.09 – Physiographic Mapping with DTM Contours
- Figure 08.10 – Granular Aggregate Potential
- Figure 11.01 – Noise Sensitive Locations within the Study Area
- Figure 11.02 – Noise Monitoring Locations
- Figure 11.03 – Borrow Pit Noise Barriers
- Figure 11.04 – Substation Noise Sensitive Locations
- Figure 12.01 – Shadow Flicker Study Area and Receptors
- Figure 14.01 – Recorded Archaeological Sites within Site
- Figure 14.02a – Location of recorded archaeological sites in north end of Site
- Figure 14.02b – Location of recorded archaeological sites in north end of Site
- Figure 14.02c – Location of recorded archaeological sites in north end of Site
- Figure 14.03a – Archaeological Sites and Protected Structures within 2km of north end of Site
- Figure 14.03b – Archaeological Sites and Protected Structures within 2km of south end of Site
- Figure 14.04 – National Monuments and Preservation Order site within 10km of Site
- Figure 14.05 – Monuments with potential visual alignments within 10km of Site
- Figure 14.06 – 1st edition 6-inch OS map of north end of Site
- Figure 14.07 – 1st edition 6-inch OS map of south end of Site
- Figure 14.08 – 25-inch OS map of north end of Site
- Figure 14.09 – 25-inch OS map of south end of Site
- Figure 14.10 – 2nd edition 6-inch OS map of north end of Site
- Figure 14.11 – 2nd edition 6-inch OS map of south end of Site
- Figure 14.12 – LiDAR image of north end of Site
- Figure 14.13 – LiDAR image of Turbines 1-8
- Figure 14.14 – LiDAR image of Turbines 9-11
- Figure 14.15 – Cultural Heritage Constraints within Grid Connection Study Area
- Figure 15.01 – Development and Transport Network
- Figure 15.02 – Haul Routes and Quarries
- Figure 15.03 – TII Collision Risk Mapping in the vicinity of the Site
